Opening Hours M-F: 07:00 AM to 4:00 PM (PST)

Social IconSocial IconSocial IconSocial Icon
Calder Coupling Slip
C-109
Type D Internal Shear band
C-109_ G
__________________________________________________________________________________________________
Calder Coupling Installation Guide. 3 Steps.
Calder Coupling Installation 1
Calder Couplings installation 2
1. Untighten end tightening clamps (worm gear or nut & bolt). Do not remove end tightening clamps from Calder Coupling
2. Slip onto pipe or around opening Calder Repair Coupling on spigot end where two pipes connect.  
calder coupling installation 3
joints logo 3
3. Provide torque to tightening clamps ( nut and bolt or worm gear). Torque at least 60 inch pounds (6.7812 N°m). Tightening clamps are on outside of coupling.
____________________________________________________________________________________________________
calder coupling 5
Section Title Icon

Get our best Quote

Request a Quote

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.